Cat lurking
Check out rating stats for this episode

10 watches

March 31, 2011
Finishing touches on the L.A. project house include replicating the original "cake frosting" detail on the walls. Also: the new bathroom's fan system; the home's new HVAC system; the finished landscape and irrigation system; the master suite and the new kitchen. In the second half: yard cleanup with rakes, blowers and lawn vacuums; the evolution of HVAC thermostat technology; the installation of carpet tiles over a concrete basement floor.
Season Finale
March 31, 2011
Season Finale
Finishing touches on the L.A. project house include replicating the original "cake frosting" detail on the walls. Also: the new bathroom's fan system; the home's new HVAC system; the finished landscape and irrigation system; the master suite and the new kitchen. In the second half: yard cleanup with rakes, blowers and lawn vacuums; the evolution of HVAC thermostat technology; the installation of carpet tiles over a concrete basement floor.

Episode Reviews

0 reviews

No one has reviewed this episode yet. Write a review and be the first!