"The Cambridge 2012 Project, The Big Finish, Part 15 of 15"
Date Aired:
Jan 09, 2013 (United States)
Avg Rating (0)
Your Rating
Norm arrives to a rainy morning in Cambridge. The weather, however, isn't stopping Roger, who is putting in the last of four granite posts. Inside, Norm finds Tom reinstalling a little piece of nostalgia from the old house: an old-school doorbell that the homeowners wanted to keep. Next, Kevin finds Sally and kitchen designer Kathy Marshall settling Sally's stuff into her new kitchen and showing off its functional features: appliances, storage, sink, faucet, chopping block drawer, and even a hideaway step stool. Downstairs, Kevin finds John with no man cave, but rather great space for the kids, a workshop of his own, and Richard, who's given him high efficiency mechanicals.